| Preliminaries |
0 |
| Demolitions and site clearance |
ls |
0 |
|
0 |
| Foundations |
0 |
| Cavity wall foundations |
ls |
0 |
|
0 |
| Sleeper wall foundations |
ls |
0 |
|
0 |
| Ground floor |
|
|
|
|
| Precast concrete beam and insulation block infill |
ls |
0 |
|
0 |
| Frame |
|
|
|
0 |
| Unfabricated structural steelwork |
ls |
0 |
|
0 |
| External walls |
|
|
|
0 |
| Facing brick clad external cavity wall (Masonry) |
ls |
0 |
|
0 |
| Pebble dash finish external cavity wall (Masonry) |
ls |
0 |
|
0 |
| Upper floor |
0 |
| Upper floor construction |
ls |
0 |
|
0 |
| Flat roof structure & finishes |
0 |
| Roof Structure (Flat) |
ls |
0 |
|
0 |
| Roof finishes - Sarnafil |
ls |
0 |
|
0 |
| Roof Windows - Glazing Vision |
ls |
0 |
|
0 |
| Rainwater goods |
0 |
| Rainwater Gutters including downpipes - Aluminium |
ls |
0 |
|
0 |
| External doors and windows |
0 |
| Windows - Jeldwen softwood |
ls |
0 |
|
0 |
| External doors - Jeldwen softwood |
ls |
0 |
|
0 |
| First fix carpentry |
0 |
| First Fix Carpentry |
ls |
0 |
|
0 |
| Internal doors |
0 |
| Internal Doors PC £500 generally |
ls |
0 |
|
0 |
| Floor finishes |
0 |
| Reinforced screed packed around heating pipes |
ls |
0 |
|
0 |
| Provisional Sum for floor finishes |
ls |
0 |
|
0 |
| Make good existing floor finishes |
ls |
0 |
|
0 |
| Wall finishes |
0 |
| 12 MR Plasterboard and skim to blockwork |
ls |
0 |
|
0 |
| 12 Plasterboard and skim to blockwork |
ls |
0 |
|
0 |
| Acoustic insulation between studs |
ls |
0 |
|
0 |
| Ceramic wall tiles |
ls |
0 |
|
0 |
| Make good existing plastered walls |
ls |
0 |
|
0 |
| Ceiling finishes |
0 |
| 12mm Plasterboard and skim to ceilings/td>
| ls |
0 |
|
0 |
| 100 Celotex XR between joists/rafters |
ls |
0 |
|
0 |
| Vapour barrier |
ls |
0 |
|
0 |
| Make good existing ceiling finishes |
ls |
0 |
|
0 |
| Second fix joinery |
0 |
| Softwood skirtings, architraves ans sundry joinery items |
ls |
0 |
|
0 |
| Fittings |
0 |
| Utility room fittings |
ls |
0 |
|
0 |
| Kitchen - supplied and fitted by Client |
ls |
0 |
|
0 |
| Possible fitted cupboard' in kitchen/sitting area |
ls |
0 |
|
0 |
| Upgrading internal spaces in addition to kitchen, utility, cloaks |
ls |
0 |
|
0 |
| Sanitaryware and tiling and making good existing bathroom |
ls |
0 |
|
0 |
| Decoration |
0 |
| Decoration - generally |
ls |
0 |
|
0 |
| Electrical installations |
|
|
|
0 |
| Electrical Installation |
ls |
0 |
|
0 |
| External ligthting |
ls |
0 |
|
0 |
| Communications Installation |
ls |
0 |
|
0 |
| Security Installation |
ls |
0 |
|
0 |
| Plumbing and mechanical installations |
|
|
|
0 |
| Gas fire - Family Room |
ls |
0 |
|
0 |
| Plumbing and heating |
ls |
0 |
|
0 |
| Boiler installation |
ls |
0 |
|
0 |
| Ventilation installation |
ls |
0 |
|
0 |
| External works |
|
|
|
0 |
| Timber deck |
ls |
0 |
|
0 |
| Services & external drainage |
0 |
| Drainage |
ls |
0 |
|
0 |
| Adapt existing external services |
ls |
0 |
|
0 |