LNG Plant Platform

An Ai-powered system to perform Schedule analysis, Cost estimates, Earned value tracking, Productivity metrics, Material management, Work packages, Custom dashboards

A prototype AI system that covers all phases of construction stage:

To start understanding how the following components were done, follow this Link



LNG Plant Monitor

Nature

Ai Prototype to analyses schedule, estimate, reports covering: Site preparation, Train-Utilities-Offsites, LNG storage, Marine works (trestle. dolphins, head, rock production), Material handling, Painting works, and much more.

LNG Plant - Schedule Analysis

Nature

Critical path visualization, Float analysis, Real-time CPM calculations



Site Preparation Agent

Nature

Covers generation, calculation, validation; it aligns with equipment sizing, risks, optimization, and CPM logic.

Site Preparation Analysis

Nature

Creating site prep workflows; automatically size excavators, haulpacks, dozers, graders; compute durations using volume, soil, crews, shifts, efficiency.



Piping Spools Management

Nature


LNG Storage & Marine Works

Nature

A Workflow Manager that performs a full analysis of LNG Tank & Marine Works.
The agent processes queries and generates realistic project data based on the Tank & Marine Works scope!



Material Management

Nature

A complete pipe material flow tracking system rendered through a Real-time web dashboard.
It shows a standardized process for different pipe types through stages like take-off, design, fabrication, painting, warehousing, installation, etc

Jetty/Breakwater - Rock Production

Nature

An agent that generates full Rock Flow workflows; Calculates crew, equipment, duration.



Pipe Shop Management System

Nature

Pipe Spools Management

Nature



CPM Planning Engine

Nature

CCPM Planning Engine

Nature


Last Planner Engine

Nature

An AI-driven pre-pour constructability control system that prevents rework, protects commissioning milestones, and produces auditable decisions



Construction Reports

Nature

Getting weekly / monthly project reports relate to civil, concrete, structural steel, architecture, mechanical, piping, electrical, instrumentation, paint, insulation disciplines to classify and analyses data of manhours, KPIs, EVs, manpower, costs to express results through S-Curves.